| IMPACT SILVER CORP. : http://www.impactsilver.com/ : QwikReport |
| Guadalupe Production Camp |
Year Ended |
6 Months Ended June 30th 2010 |
Dec 31st 2009 |
Dec 31st 2008 |
Dec 31st 2007 |
Change |
|---|---|---|---|---|---|
| Silver Production (oz) | 360,767 | 823,571 | 645,668 | 348,949 | +82% |
| Lead (t) | 380 | 969 | 813 | 601 | +35% |
| Zinc (t) | 521 | 1,098 | 1,053 | 976 | +8% |
| Revenue per production tonne sold | $104.46 | $109.51 | $89.89 | $72.56 | +24% |
| CA$ direct cost/tonne produced | $54.25 | $60.39 | $54.80 | $44.15 | +24% |
SALVADORA VEIN DRILL HOLES |
|||||||
|---|---|---|---|---|---|---|---|
DRILL |
TOP OF INTERCEPT |
ESTIMATED |
SILVER |
SILVER |
GOLD |
ZINC |
LEAD |
HOLE No. |
(m) |
TRUE WIDTH (m) |
(g/t) |
opt |
(g/t) |
(%) |
(%) |
24 |
95.0 |
0.2 |
688 |
20.1 |
0.32 |
0.66 |
0.30 |
|
|
|
|
|
|
|
|
25 |
245.8 |
0.4 |
538 |
15.7 |
0.12 |
0.80 |
0.15 |
|
Including: |
0.1 |
2,120 |
61.8 |
0.41 |
3.12 |
0.48 |
| SUMMARY OF SANTA LUCIA DRILL INTERSECTIONS | ||||||
|---|---|---|---|---|---|---|
| DRILL HOLE |
VEIN NAME | FROM (m) |
TO (m) | INTERVAL (m) |
SILVER (g/t) |
GOLD (g/t) |
| SECTION 1450N | ||||||
| Z09-34 | EL CAGUILOTE | 155.43 |
156.63 |
1.20 |
159.5 |
0.02 |
| SECTION 1550N | ||||||
| Z09-35* | EL YOYOTE UPPER | 69.94 |
70.54 |
0.60 |
871.0 |
0.04 |
| Z09-35* | EL YOYOTE MAIN | 81.42 |
82.85 |
1.43 |
600.1 |
0.08 |
| Z09-35* | EL YOYOTE MAIN | 82.16 |
82.85 |
0.69 |
893.0 |
0.15 |
| Z09-37* | EL YOYOTE UPPER | 73.2 |
73.77 |
0.57 |
1,905.0 |
0.15 |
| Z09-37* | EL YOYOTE MAIN | 81.22 |
82.35 |
1.13 |
196.0 |
0.01 |
| Wed Dec 16, 2009 IMPACT Intersects 466 G/T Silver Over 3.2 Meters At Santa Lucia IMPACT Silver Corp. ("IMPACT") is pleased to announce additional drill results from a 1,500-meter Phase One drill program at the Santa Lucia Mining Camp located 3.7 kilometers southeast of IMPACT's processing plant in Royal Mines of Zacualpan Silver-Gold District of central Mexico. In a previous press release (dated October 6, 2009), the first five holes of this program were summarized, including highlights of 1,905 g/t silver over 0.57 meters and 600g/t silver over 1.43 meters . Summari... (13 KB) |
||
| Tue Oct 6, 2009 Impact Reports Initial Drill Results From Santa Lucia Silver Veins IMPACT Silver Corp. ("IMPACT") is pleased to announce the initial results from a 1,500-meter Phase I drill program at the Santa Lucia Mining Camp located 3.7 kilometers southeast of IMPACT's operating processing plant in the prolific Royal Mines of Zacualpan Silver-Gold District of central Mexico. Detailed geological mapping and soil sampling by IMPACT outlined a variety of high-grade silver targets consisting of old mine workings and outcropping veins along a northwesterly trending structural ... (9 KB) |
||
| Mon Nov 24, 2008 Impact Silver Announces Record Quarterly Silver Production IMPACT Silver Corp. ("the Company" or "IMPACT") is pleased to announce record quarterly silver production of 169,273 ounces, up 98% from 85,610 ounces in 2007. Gross revenues for the third quarter were $2,244,000, up 40% from $1,604,000 in the third quarter of 2007. Higher revenues due to increased silver, lead and zinc production helped offset lower realized silver, lead and zinc prices resulting in a small net loss of $233,000 for the quarter. During the quarter, a dramatic change in co... (9 KB) |
||
| Thu Aug 21, 2008 Impact Silver Announces Second Quarter Earnings IMPACT Silver Corp. ("IMPACT" or "the Company") is pleased to announce its financial and operational results for the quarter ended June 30, 2008, which include the results of the Royal Mines of Zacualpan Project in Mexico. Gross Revenues for the second quarter exceeded $1.75 million and net income for the quarter was $305,000 ($0.01 per share). Year-to-date cash flow from operations is $1,749,000, up $1,705,000 from $44,000 in 2007. ... (8 KB) |
||
| Mon May 26, 2008 Impact Silver Announces Record First Quarter Earnings And Silver Production IMPACT Silver Corp. ("IMPACT") is pleased to announce record financial and operational results for the quarter ended March 31, 2008. The Company's consolidated financial statements include the results of Royal Mines of Zacualpan Project ("Zacualpan") in Mexico. Gross Revenues for the first quarter exceeded $2.6 Million and net income for the quarter was $845,000 ($0.02 per share). Mine operating earnings for the quarter were $1.3 million. IMPACT ended the quarter with cash and cash equivalent... (7 KB) |
||
| Fri Nov 23, 2007 IMPACT Announces Operating Earnings of $358,000 IMPACT Silver Corp. (IPT: TSX.V) ("IMPACT" or "the Company") is pleased to announce its results for the quarter ended September 30, 2007. The Company's consolidated financial statements include the results of Royal Mines of Zacualpan Project ("Zacualpan") that was purchased on January 16, 2006 and resumed production on January 18, 2006. Results for the quarter reflected slightly lower revenues, $1,603,907 compared to $1,676,896 in the prior quarter, due to third quarter weakness in silver ... (6 KB) |
||
| Mon Aug 27, 2007 Impact Announces Second Quarter Results IMPACT Silver Corp. (IPT: TSX.V) ("IMPACT" or "the Company") is pleased to announce its results for the quarter ended June 30, 2007. The Company's consolidated financial statements include the results of the Royal Mines of Zacualpan Project ("Zacualpan") that was purchased on January 16, 2006 and resumed production on January 18, 2006. For the 2007 second quarter, the Company's net revenues were $1,677,000 (2006 -- $1,977,000) and net loss of $48,000 (2006 -- $103,000). Year to date net reven... (5 KB) |
||
| Wed May 30, 2007 Impact Announces Continuing Improvement In Operations IMPACT Silver Corp. (IPT: TSX.V) ("IMPACT" or "the Company") is pleased to announce its results for the quarter ended March 31, 2007. The Company's consolidated financial statements include the results of Royal Mines of Zacualpan Project ("Zacualpan") that was purchased on January 16, 2006 and resumed production on January 18, 2006. For the 2007 first quarter, the Company's net revenues were $1,859,000 (2006 - $1,146,000) and net profit was $266,000 (2006 - $178,000). The comparative resul... (5 KB) |
||
| Thu Apr 19, 2007 IMPACT Reports $2.4 Million in Operating Earnings for 2006 IMPACT Silver Corp. (IPT: TSX.V) ("the Company") is pleased to announce its results for the year ended December 31, 2006. The Company's consolidated financial statements include the results of Royal Mines of Zacualpan Project ("Zacualpan") that was purchased on January 16, 2006. For the year 2006, the Company's net earnings per share (EPS) were $0.03. FULL YEAR RESULTS (CDN$ 000'S EXCEPT PER-SHARE AMOUNTS) ---------------------------------------------- ... (6 KB) |
||
| Tue Nov 28, 2006 Impact Announces Third Consecutive Profitable Quarter IMPACT Silver Corp. (IPT:TSX.V) ("the Company") is pleased to announce its results for the quarter ended September 30, 2006. The Company's consolidated financial statements include the results of Royal Mines of Zacualpan Project ("Zacualpan") that was purchased on January 16, 2006 and assumed production on January 18, 2006. For the quarter, the Company's net revenues were $1,872,595 and Zacualpan had an operating profit of $546,959 up from $480,820 in the second quarter. ... (5 KB) |
||
| Thu Jan 25, 2007 Impact Silver Announces Early Stage Drill Results And Commencement Of Mining On The Salvadora Vein IMPACT Silver Corp. ("IMPACT") is pleased to announce drill results from the balance of the 2006 surface drill program at the Royal Mines of Zacualpan Silver Project. These results are from the last three early stage exploration areas tested. PINO PROSPECT The Pino Prospect is an early stage prospect on the Lipton Vein system. It is located 700m south of the Guadalupe Mine which has historically produced 10 million ounces of silver predominantly from the Lipton Vein. IMPACT continues to m... (17 KB) |
||
| Thu Apr 27, 2006 IMPACT Silver Announces Signing of Drill Contract IMPACT Silver Corp. ("IMPACT") is pleased to announce that it has signed a drill contract for a minimum 2000m surface core drilling program. The program is planned to start in the beginning of May and will test three priority targets: San Ramon extension, Chivo Prospect and Pino Prospect. SAN RAMON MINE EXTENSION The first holes will be drilled to outline the extension of the San Ramon high grade silver shoot at depth. Plans are to drill holes up to 80m below the deepest mine workings pr... (2 KB) |
||
| Thu Jan 25, 2007 Impact Silver Announces Early Stage Drill Results And Commencement Of Mining On The Salvadora Vein IMPACT Silver Corp. ("IMPACT") is pleased to announce drill results from the balance of the 2006 surface drill program at the Royal Mines of Zacualpan Silver Project. These results are from the last three early stage exploration areas tested. PINO PROSPECT The Pino Prospect is an early stage prospect on the Lipton Vein system. It is located 700m south of the Guadalupe Mine which has historically produced 10 million ounces of silver predominantly from the Lipton Vein. IMPACT continues to m... (17 KB) |
||
| Wed Sep 7, 2005 New High Grade Silver Discoveries IMPACT Silver Corp. ("IMPACT") is pleased to provide an update on the Royal Mines of Zacualpan silver project in Mexico. Over 100 silver prospects have been catalogued on the property and IMPACT field crews are systematically carrying out a program of mapping and sampling to prioritize prospects for the next round of drilling. Highlights from recent work include the following: CHIVO WORKINGS Field crews have traced the Compadres Vein System a distance of 1300m northwest of the high grade C... (2 KB) |
||
| Copyright © 2010 by Impact Silver Corp. All rights reserved worldwide. |